GLOBAL SHIPPING AND TRANSPORT

Proven knowledge and experience related to the safe and efficient moving of cargoes globally. We act as an unbiased third party, reviewing plans, assessing risks, and offering recommendations to improve safety, efficiencies and bottom line. Seamless project execution with detailed planning and engineering, our advisors create innovative solutions for your global requirements.​​

​Our team advises on shipping in various sectors: 

Heavy Lift Shipping

Ship Brokering 

Contracts and Charter Parties 

•    Voyage Charters 

•    Time Charters

•    Contracts of Affreightment (COA). 

Ship Management 

Vessel Operation

Maritime Research Analysis

•    Logistics

•    Voyages 

•    Markets

•    Shipping Sustainability 

•    Strategy Formulation 

•    Heavy Lift Shipping 

•    Dry Bulk Shipping 

•    Tanker Shipping 

•    Offshore Shipping 

•    Container Shipping 

•    Ferry and Ro-Ro

•    MASS Maritime Autonomous Surface Ships

CASE HISTORY

DVL advisors worked closely with British Petroleum (BP) to provide the shipping and delivery of an accommodation module for the Mad Dog floating platform rig, a BP spar facility located in the Gulf of Mexico. Originating from the Pharmadule Emtunga's Arendal manufacturing yard in Gothenburg, Sweden the module required a total of circa 45 sets of axles on self-propelled modular transports platform-heavy haulers for transfer to the port for loading.

 

Module Size: 200 l x 70 h x 90 w feet / 61 x 21 x 27 m

Weight: 1,220 tonnes / 1,220,000 kg

Volume: 35,670 m2 

 

The all-steel living quarters structure includes a helideck and was built to accommodate 130 engineers and personnel working around the clock on the floating rig. Ocean going barge towed by a ocean going tug was one of the options reviewed for the ocean transport. However, risk analysis determined a ship as best solution to avoid a broken tow line and the potential of complete loss of the unit and the barge, a set back that would cost millions with an additional three year set-back to build the replacement. Time was also a factor as North Atlantic crossing at year-end is the roughest time of the year.

Heavy Lift, Risk Analysis and Shipping: Accommodation module for BP Mad Dog

7501000200_3a8aefa7de_b.jpg
th_98672.png.avif

Above: Accommodation module on PB's Mad Dog floating platform in the Gulf of Mexico (America)

Accommodation module leaving Gothenburg facility